Projects & Rebuilds
Use this page when you want to see how a Gaggia Classic project actually comes together: the goal, the parts, the awkward bits, and what changed after the machine went back on the counter. Good rebuild notes are not trophy photos. They show the small decisions that matter before you open the case.
ShopWhat useful rebuild notes include
A useful rebuild note starts with the problem on the bench, then shows the parts, checks, mistakes, and after-use result. The best ones include the boring details too: screw access, wiring clearance, warm-up behavior, and what was not fixed by the mod.

Three kinds of project logs worth publishing
Mechanical comfort upgrades
Steam knob changes, panel swaps, drip tray changes, and workflow improvements that are easier to attempt.
Control upgrades
PID kits, display modules, sensor additions, and the first steps toward more stable, repeatable brewing.
Full rebuild stories
Used-machine rescues, repainting, boiler service, wiring correction, and step-by-step long-form builds.
Recommended build-log structure

A structured log should include: machine generation, project goal, required skill level, safety checks, parts used, before-and-after photos, lessons learned, and next recommended pages. This keeps the section useful for readers and safe for the brand.
Shop